Exhibit 1. General Requirements
Exhibit 2. Overview and Public Involvement
Exhibit 3. Location of Facilities
Exhibit 4. Land Use
Exhibit 5. Electric System Effects
Exhibit 6. Wind Power Facilities
Exhibit 7. Natural Gas Power Facilities
Exhibit 8. Electric System Production Modeling
Exhibit 9. Alternatives
Exhibit 10. Consistency with Energy Planning Objectives
Exhibit 11. Preliminary Design Drawings
Exhibit 12. Construction
Exhibit 13. Real Property
Exhibit 14. Cost of Facilities
Exhibit 15. Public Health and Safety
Exhibit 16. Pollution Control Facilities
Exhibit 17. Air Emissions
Exhibit 18. Safety and Security
Exhibit 19. Noise and Vibration
Exhibit 20. Cultural Resources
Exhibit 21. Geology, Seismology, and Soils
Exhibit 22. Terrestrial Ecology and Wetlands
Exhibit 23. Water Resources and Aquatic Ecology
Exhibit 24. Visual Impacts
Exhibit 25. Effect on Transportation
Exhibit 26. Effect on Communications
Exhibit 27. Socioeconomic Effects
Exhibit 28. Environmental Justice
Exhibit 29. Site Restoration and Decommissioning
Exhibit 30. Nuclear Facilities
Exhibit 31. Local Laws and Ordinances
Exhibit 32. State Laws and Regulations
Exhibit 33. Other Applications and Filings
Exhibit 34 Electric Interconnection
Exhibit 35 Electric and Magnetic Fields
Exhibit 36. Gas Interconnection
Exhibit 37. Back-Up Fuel
Exhibit 38. Water Interconnection
Exhibit 39 Wastewater Interconnection
Exhibit 40 Telecommunications Interconnection
Exhibit 41. Applications to Modify or Build Adjacent
Figure 1-1. Regional Project Location
Figure 2-1. Project Area and Study Area
Figure 3-1. Project Component Locations
Figure 3-1. Project Component Locations Part 2
Figure 4-1. Existing Land Uses
Figure 4-2. Existing Utility Locations
Figure 4-3. Tax Parcels
Figure 4-3. Tax Parcels Part 2
Figure 4-4. Town of Sharon Zoning Map
Figure 4-5. Specially Designated Areas
Figure 4-6. Recreational and Other Sensitive Land Uses
Figure 4-7. Aerial Photography of the Study Area
Figure 4-8. Farmland Classifications of the Project Area
Figure 9-1. Alternate Layout
Figure 13-1. Real Property Map of Generating Site and Interconnection Facilities
Figure 15-1. Public Health and Safety
Figure 15-2. Receptor LocationsFigure 21-1. Existing Slopes
Figure 19-1 Sensitive Sound Receptor Map
Figure 21-2. Soil Types
Figure 21-3. Bedrock
Figure 21-4. Seismic Hazards
Figure 22-1. Plant Communities of the Project Area
Figure 22-2. Plant Communities within 500 Feet of Disturbance Part 1
Figure 22-2. Plant Communities within 500 Feet of Disturbance Part 2
Figure 22-2. Plant Communities within 500 Feet of Disturbance Part 3
Figure 22-2. Plant Communities within 500 Feet of Disturbance Part 4
Figure 22-2. Plant Communities within 500 Feet of Disturbance Part 5
Figure 22-2. Plant Communities within 500 Feet of Disturbance Part 6
Figure 22-3. Delineated Wetlands and Streams Part 1
Figure 22-3. Delineated Wetlands and Streams Part 2
Figure 22-3. Delineated Wetlands and Streams Part 3
Figure 22-3. Delineated Wetlands and Streams Part 4
Figure 22-3. Delineated Wetlands and Streams Part 5
Figure 22-3. Delineated Wetlands and Streams Part 6
Figure 22-4. Mapped Wetlands
Figure 23-1. Groundwater Aquifers and Recharge Areas
Figure 23-2. Surface Waters
Figure 25‐1. Project Area Accident Map (Included in Exhibit 25)
Figure 25‐2. Project Area Site Distribution Percentages (Included in Exhibit 25)
Figure 25‐3. LOS Criteria and Speed-Flow Curves for Multilane Highway Segments (Included in Exhibit 25)
Figure 25‐4. Follower Density Equation (Included in Exhibit 25)
Figure 28-1. Census Block Groups in the Vicinity of the Project
Appendix 1-1. Certificate of Formation
Appendix 2-1. Jinko Eagle 72HM G2 380-400 Watt Mono Perc Half Cell Module Technical Data Sheet
Appendix 2-2. Gamechange Solar Genius TrackerTM Data Sheet
Appendix 2-3. Gamechange MaxspanTM Pile Driven System Data Sheet
Appendix 2-4. Power Electronics HEM Inverter Data Sheet
Appendix 2-5. PIP Meeting Log
Appendix 2-6. Stakeholder List
Appendix 5-1. System Reliability Impact Study
Appendix 5-2. Collection Substation Design Criteria
Appendix 5-3. Preliminary Operations and Maintenance Plan
Appendix 8-1. Production Modeling Analyses
Appendix 11-1 General Drawing Index
Appendix 11-1 Drawings C-001-009
Appendix 11-1 Drawings C-010-020
Appendix 11-1 Drawings C-021-035
Appendix 11-1 Drawings C-036-052
Appendix 11-1 Drawings C-053-204
Appendix 11-1 Landscaping Plan
Appendix 11-1 Substation Diagram
Appendix 11-1 Collection Details
Appendix 11-1 T-line Details
Appendix 11-2 Landscaping Plan
Appendix 12-1. Quality Assurance and Quality Control Plan
Appendix 12-2. NextEra Energy Major Duties & Accountability Matrix
Appendix 12-3. Complaint Resolution Plan
Appendix 13-1. Surveys of Properties Leased or Purchased by Applicant
Appendix 13-2. Demonstration that the Applicant has Obtained Rights in the Project Area
Appendix 14-1. Estimated Cost of Facilities
Appendix 18-1. Site Security Plan
Appendix 18-2. Preliminary Emergency Response Plan
Appendix 19-1. East Point Energy Center, Pre-Construction Sound Level Impact Assessment (PNIA) A
Appendix 19-1. East Point Energy Center, Pre-Construction Sound Level Impact Assessment (PNIA) B
Appendix 19-2. Sound Testing Compliance Protocol
Appendix 20-1. Phase IA/B Archaeological/Cultural Resource Study
Appendix 20-2. New York State Office of Parks, Recreation and Historic Preservation Project-Related Correspondence
Appendix 21-1. Preliminary Geotechnical Engineering Report
Appendix 21-2. Preliminary Blasting Plan
Appendix 21-3. Inadvertent Return Plan
Appendix 22-1. Plant and Wildlife Inventory List
Appendix 22-2. Breeding Bird Surveys
Appendix 22-3. Winter Raptor Surveys
Appendix 22-4. Wetland and Stream Delineation Report A
Appendix 22-4. Wetland and Stream Delineation Report B
Appendix 22-4. Wetland and Stream Delineation Report C
Appendix 22-4. Wetland and Stream Delineation Report D
Appendix 22-4. Wetland and Stream Delineation Report E
Appendix 22-4. Wetland and Stream Delineation Report F
Appendix 22-4. Wetland and Stream Delineation Report G
Appendix 22-5. Wetland Functions and Values Assessment
Appendix 22-6. Invasive Species Management and Control Plan
Appendix 22-7. Grassland Breeding Birds Cumulative Impacts Assessment
Appendix 22-8. Agency Correspondence
Appendix 23-1. FOIL Requests and New York State Department of Health Letters
Appendix 23-2. Water Well Survey and Responses
Appendix 23-3. Preliminary Stormwater Pollution Prevention Plan
Appendix 24-1. Visual Impact Assessment A
Appendix 24-1. Visual Impact Assessment B
Appendix 24-1. Visual Impact Assessment C
Appendix 24-2. Glint and Glare Analysis
Appendix 25‐1. Construction Worker Route Maps
Appendix 25‐2. Sight Distance Diagram
Appendix 25‐3. New York State Department of Transportation Average Annual Daily Traffic Volumes
Appendix 25‐4. Accident Summary Data 2016-2018
Appendix 25‐5. New York State Department of Transportation Bridge Load Rating
Appendix 25‐6. Highway Capacity Software Level of Service Output
Appendix 29-1. Decommissioning & Restoration Plan
Appendix 31-1. Applicable Local Laws and Regulations A
Appendix 31-1. Applicable Local Laws and Regulations B
Appendix 31-1. Applicable Local Laws and Regulations C
Appendix 31-1. Applicable Local Laws and Regulations D
Appendix 35-1. Electric and Magnetic Field Calculation Report